How we fixed margins for four Midland companies
We do not do fancy slides. We configure software that works. Here are the actual numbers from recent implementations in Birmingham, Coventry, and Shropshire.
Cut raw material waste by 23% for a Shropshire food producer
We introduced simple AI forecasting tools that aligned ingredient orders with historical weekly bakery demand, reducing spoiled stock.
Boosted retail store margin by 3.2% across 7 locations in the Midlands
Cleaned and connected point-of-sale databases to identify and eliminate slow-moving stock lines that were draining holding cash.
Saved 14.5 hours of route planning per week for a steel carrier
Replaced a manual dispatch board with real-time routing software, optimizing multi-drop schedules for a fleet of 11 HGVs.
Reduced machine idle downtime by 19% in Coventry
Set up rugged tablet tracking on the factory floor so operators could flag raw material delays instantly to the supervisor desk.
Ready to fix your operational bottlenecks?
Let's look at the actual numbers on your shop floor. Book a brief call to see if our tracking tools fit your current setups.
“I was skeptical because other consultants gave us big promises and empty slideshows. David's team spent three days sitting with our drivers, then built a route system that works around peak M6 queues. Our dispatch prep dropped from 4 hours to 1.5.”
Marcus Vance
Director of Operations, Vanguard Transport Ltd
“We had dozens of tracking mismatches between our Coventry warehouse and online shops. Onboarding with OI took about 3 weeks longer than I expected, mostly because our legacy database was a mess. But once live, we recovered £3,800 in lost stock in the first month.”
Clara Higgins
Inventory Manager, Midland Spares & Logistics
“They noticed the raw material scrap rates on the production floor were logged incorrectly on our very first walk-through. They configured simple tablet logging on the lines, which brought machine downtime down by 19%.”
Richard Thorne
Plant Supervisor, Apex Mouldings Ltd
“I was skeptical because other consultants gave us big promises and empty slideshows. David's team spent three days sitting with our drivers, then built a route system that works around peak M6 queues. Our dispatch prep dropped from 4 hours to 1.5.”
Marcus Vance
Director of Operations, Vanguard Transport Ltd
“We had dozens of tracking mismatches between our Coventry warehouse and online shops. Onboarding with OI took about 3 weeks longer than I expected, mostly because our legacy database was a mess. But once live, we recovered £3,800 in lost stock in the first month.”
Clara Higgins
Inventory Manager, Midland Spares & Logistics
“They noticed the raw material scrap rates on the production floor were logged incorrectly on our very first walk-through. They configured simple tablet logging on the lines, which brought machine downtime down by 19%.”
Richard Thorne
Plant Supervisor, Apex Mouldings Ltd
*We do not sell software subscriptions. You pay a one-off project fee for our implementation work.